Skip to main content
close

KingCounty.gov is an official government website. Here's how you knowexpand_moreexpand_less

account_balance

Official government websites use .gov

Website addresses ending in .gov belong to official government organizations in the United States.

lock

Secure .gov websites use HTTPS

A lock lock or https:// means you've safely connected to the .gov website. Only share sensitive information on official, secure websites.

Island Center Forest

The sun shining through evergreen trees with a dirt path running through it

2025 Island Center Forest Health Work

King County Parks is planning 45.4 acres of commercial tree thinning in Island Center Forest across eight units, and 4.7 acres of drop-and-leave cutting in four alder “gap” cuts. Along Fir Hill Trail, dead and dying trees that posing a risk to trail users will be cut and left on-site. View a map of the project site. The project’s objectives are to reduce the forest’s density to improve long-term drought and climate resilience, allow space for planting root rot-resistant tree species, and initiate a new cohort of trees in areas with declining red alder tree canopy and carbon volumes. Work could start as soon as late September 2025, though weather, permitting, and contractor availability may shift the start date into the fall. Although unlikely, this work could get delayed to 2026 depending on contractor availability. Work will pause during the ICF deer hunt in October.

King County is working on finalizing SEPA and plans to submit a Forest Practices application in August 2025. This website will show all updates to the permitting process and project timeline.

  • Most of the work (36 acres) will take place in dense Douglas-fir areas, cutting and removing about half of the Douglas-fir trees. The objectives for the Douglas-fir treatments are to shift from overly-dense stands to less-dense, more diverse and drought-resistant conifer stands; prevent density-dependent tree mortality; slow the spread of laminated root rot and plant with rot-resistant species.
  • In the red alder stands (9 acres), treatments will transition the forest from declining alders to more diverse, climate resilient mixed species stands. Most alders will be cut and removed, while all other trees will be retained. Alders make up around 2/3 of the tree species in the red alder stands (Douglas-fir and other conifers make up the other portion). The County will replant the stand with conifers and will also encourage naturally-resprouting red alder to re-initiate a new cycle of this short-lived species.
  • This project is part of King County’s commitment to sustainable long-term timber production in line with ICF’s “working forest” designation, described in King County’s Comprehensive Plan (2022). Similar projects have taken place at ICF since 2008.
  • 115th Ave SW will remain open to residents at all times during the work (both on the north end of the park coming from SW Bank Rd, and the south end coming from SW Cemetery Rd). The roads will be maintained for passenger vehicles at all times during the work. The gravel portion of 115th Ave SW on the north end coming from SW Bank Rd will undergo long-overdue maintenance to return that road to County road standards.
  • Several trails, Mukai Trailhead, and Cemetery Trailhead will be closed for an estimated 8 weeks while the work takes place. Trail closures will include portions or all of Techmo, 115th Bypass, 188th Bypass, Landtrust, Gallops, Fir Hill, Valley of the Firs, and others for some or all of the project duration. King County will minimize trail impacts and closures as much as possible. 115th Bypass Trail will undergo substantial grading, drainage improvements, and cutting back vegetation along the shoulders. 188th Bypass between 115th Bypass and Fir Hill Trails with be obliterated and revegetated after the project upon request of King County Backcountry Trails. The new 188th trail will be the east-west route connecting those trails.

For additional information, please contact King County Parks Forester Paul Fischer, 206-817-8259 (cell) or pfischer@kingcounty.gov.

About the Park

Located in the center of Vashon Island, Island Center Forest is a Forest Stewardship Council® (license code FSC-C008225) certified working forest and natural area managed to demonstrate sustainable forest management while protecting and restoring the health of the site's habitat. Enjoy a picnic at the Forest Cathedral picnic shelter designed and built by islanders using local island wood.

Ten miles of multi-use trails lead visitors through 440 acres of consisting of forested stands, meadows, the Mukai Pond and the Meadowlake wetlands which form the headwaters of Judd Creek. Island Center Forest is habitat to a variety of wildlife, including more than 70 bird species.

Coinciding with the Washington Department of Fish and Wildlife’s designated hunting season in October, 220 acres of Island Center Forest are open for seasonal deer hunting and closed to other visitors, making this the only public land on Vashon Island where deer hunting has been allowed.

Park activities and facilities

Birding

Dog walking

Hiking

Horseback riding

Mountain biking

Nature observation

Picnic shelter

Volunteer


Location

10612 Southwest 188th Street, Vashon, WA 98070

Nearby Bus Stops

118, 119 on Vashon Hwy SW

Parking

There is a parking lot at Southwest 188th Street that can accommodate horse trailers. Parking is limited to cars only at the Cemetery Trailhead on 115th Avenue Southwest.

Trailheads

There are four trailheads:

Mukai Trailhead: At the end of 115th Avenue Southwest

Westside Trailhead: Off of Westside Highway West, north of the Vashon Recycling and Transfer Station

Cemetery Trailhead: At the end of 115th Avenue Southwest

188th Trailhead: At the end of Southwest 188th Street

expand_less