SE Edgewick Road Slide Repair Project

Road opened to traffic on April 6, 2026

Rocks on a slop along side of road

March 29, 2026: Crews repaired the slide and rebuilt the slope with large rocks to reenforce the road.

Status update

April 6, 2026

Crews opened SE Edgewick Road to traffic on Monday, April 6, 2026.

In the coming days, crews will return to remove the temporary bridge along the alternative route and make any needed repairs to the driveway. We’ll let the community know when this work is scheduled.

During the week of April 6, crews are also working on an additional drainage project near the slide location in the 456th block. Please expect flaggers who will direct two-way traffic through a single open lane.

For the most up to date information on Road Services Division work, please visit our MyCommute website.

Project overview

Crews identified that water could damage SE Edgewick Road, and in 2009 perforated pipes were installed to drain water away from the downslope. We believe that over time, one of those pipes shifted and allowed water to seep under the road. The amount of water during the December 2025 storm was unprecedented and the drainage system could not keep up.

To repair the road, crews cut into the hillside and added rock to reinforce the road and fix the slide. The team also installed drainage improvements to reduce the risk of future slides.

Project location map

Graphic map of project location mark by red callout

SE Edgewick Road is a sole access road located SE of North Bend, WA.

Project Documents

A community meeting was held on February 10, 2026. You can view the slide deck here (5.5 MB).

Frequently asked questions

Yes. Crews removed four trees to make space to repair the road and rebuild the slope.

Photos

New asphalt on road with roads maintenance vehicles.

April 4, 2026: The road has been paved and crews are installing guardrail. 

 

Concrete drainage system in gravel road

April 4, 2026: The road has been paved and crews are installing guardrail. 

 

Snow on road with construction crane

March 15, 2026: Snow slowed progress on the repairs

 

Dirt slope with construction crane

February 21, 2026: Crews dug out the previous road to prepare for slope stabilization. 

 

Aerial viewlokingdown on construction barriers on gravel road with heavy machinery

February 17, 2026: Construction to repair the slide on SE Edgewick Road has begun.

 

A picture containing tree, outdoor, ground, yellow

February 7, 2026: Crews added a temporary bridge over the existing private bridge along the alternative route. The temporary bridge does not have any weight limit restrictions and allows for emergency responders to access the Edgewick neighborhood during construction.

 

January 7, 2026: Two-way traffic can now use a single lane of SE Edgewick Road. The road is very narrow (9.5 ft wide) with a 10-ton weight limit restriction. Please use extreme caution when using the road, especially in the dark. 

 

Private bridge at SE Edgewick Road with new lower posted weight limit.

December 30, 2025: The private bridge at 44660 SE Edgewick Road now has a new, lower posted weight limit restriction of 5 tons.

 

Gravel trail with closed signs

December 18, 2025: The Snoqualmie Valley Trail is closed to pedestrians and bicyclists so that it can be used as an alternative route for the SE Edgewick Road community. The Parks Division placed signs to show that delivery vehicles are not allowed to use the trail. We need to limit use of this alternative route so that the trail is preserved as much as possible.

 

Image of roadslide from bottom of slide

December 13, 2025: more water from the atmospheric river caused the hillside above SE Edgewick to slide. This slide is slightly uphill from the road damage. 

 

Ornage construction barriers and pillars along road

On December 11, 2025, crews added compacted gravel to the road shoulder to create a narrow one lane on SE Edgewick Road with a 5-ton limit on vehicle weight. Shortly after, additional water forced this option to be closed.

 

On December 9, 2025, the ground underneath SE Edgewick Road slid during a rainstorm.